Smart Renovation of a Residential Unit in Glen Huntly

Gold People Choice Award BadgeSilver People Choice Award BadgeBronze People Choice Award Badge

A 1960s home renovation modernising the kitchen and bathroom while optimizing space and balancing budget challenges.

Before After
Before
Before
No items found.

Project Overview

The homeowner sought to renovate her 1960s-built independent unit, modernising the kitchen and bathroom while optimising the layout for better functionality. She was referred to the Refresh Renovation team by a previous client and trusted them to handle the design and build process from start to finish.

The renovation aimed to convert the old meals area into a new kitchen and repurpose the previous kitchen space into a bedroom for her son. The bathroom was also fully upgraded. The client was conscious of her budget and wanted to supply some materials herself while involving her father, a retired electrician, to keep costs down. However, unforeseen challenges required adjustments to the original plan.

Major Challenges and Solutions

Electrical Work Delays

The client initially planned for her father to handle all electrical work, but two weeks before the project commenced, he suffered an accident and was unable to proceed. The Refresh Renovation team quickly sourced a professional electrician, reorganising the schedule to minimise delays.

Budget Constraints and Material Selections

The client was keen to supply her own materials. The team worked closely with her, breaking down quotes into manageable chunks, allowing her to prioritise expenses while maintaining the quality of the renovation.

Design Highlights

Kitchen Transformation:

  • The kitchen was relocated to the old meals area, creating a more spacious and efficient layout.
  • Durable cabinetry and modern appliances enhanced functionality and appeal.
  • The previous kitchen was converted into a bedroom, making the unit more suitable for her family’s needs.

Bathroom Renovation:

  • A complete gut and remodel. 
  • A walk-in shower was installed, enhancing accessibility and modern aesthetics.
  • Updated fixtures and fittings provided a contemporary look.
No items found.

Project Execution

The Refresh Renovation team led by Renovation Consultant Leigh McDonald took a structured approach to ensure the renovation was completed efficiently and to a high standard.

Planning and Design:

  1. The Refresh Renovation team managed the entire design and build process, including selections and project management.
  2. The open-plan concept required structural adjustments, including removing a wall and altering window placements to optimise natural light.

Construction:

Tradespeople involved:

  1. Electrician
  2. Plumber
  3. Plasterer
  4. Carpenter
  5. Demolition crew
  6. Painter
  7. Glazier (for shower screens)
  8. Tilers & Waterproofer
  9. With efficient scheduling, the team ensured smooth execution despite last-minute changes in electrical work.

Completion:

  1. Although the project ran one week over schedule, the final result met the client’s expectations, delivering a modern, functional, and refreshed space.
  2. The kitchen and bathroom renovations significantly improved the unit’s liveability, while the additional bedroom increased property value.

Client Feedback

The client appreciated Leigh and his team’s ability to adapt to challenges while keeping her budget considerations in mind. She was particularly pleased with the kitchen relocation, which transformed the unit’s functionality. Despite the unexpected changes with the electrical work, the project was successfully completed to a high standard.

Final Thoughts

This project exemplifies the Refresh Renovation team’s ability to navigate challenges, manage budgets effectively, and deliver high-quality renovations. By redesigning the kitchen layout and upgrading the bathroom, they enhanced the overall liveability of the home while ensuring the client’s vision was met.

If you’re considering a renovation and need expert guidance, contact the Refresh Renovation team today to bring your project to life!

This project was completed in
February 2025
.
Project description
A 1960s home renovation transforming the kitchen and bathroom while optimizing the layout to enhance functionality, style, and budget efficiency.
Location
Victoria
Australia
Client
Project duration
13 weeks (Initial estimate: 12 weeks)
Cost estimate
$85,000
Actual cost
$115,000
Challenges
Unexpected electrical work delays and budget constraints required quick adjustments, with a new electrician sourced and material selections prioritised to maintain quality.
Interesting aspects
Share to

Leigh McDonald is Renovation Consultant of 27 MAC Pty Ltd (CDB-U 61358), a franchisee of Renovation Franchise, doing business in Melbourne

Actual costs vary by project. Plan ahead to reduce the impact of industry changes or disruptions. For more information see here.

Reno now,
pay later.

Talk to us about finance options

Talk to a renovation consultant today

If you would like to find out how Refresh Renovations can support you with a high quality, efficient home renovation, get in touch today. Your local Refresh Renovations consultant will be happy to meet with you for a free, no obligations consultation.

Get in touch
No items found.